Sanyo R410A Installation Instructions Manual page 37

W-3way eco-i system air conditioner
Hide thumbs Also See for R410A:
Table of Contents

Advertisement

(3) Do a leak test of all joints of the tubing (both indoor
and outdoor) and all service valves. Bubbles indicate
a leak. Wipe off the soap with a clean cloth after a
leak test.
(4) After the system is found to be free of leaks, relieve
the nitrogen pressure by loosening the charge hose
connector at the nitrogen cylinder. When the system
pressure is reduced to normal, disconnect the hose
from the cylinder.
Evacuation
(1) Attach the charge hose end described in the preced-
ing steps to the vacuum pump to evacuate the tub-
ing and indoor unit. Confirm that the "Lo" knob of the
manifold valve is open. Then, run the vacuum pump.
The operation time for evacuation varies with the
tubing length and capacity of the pump. The follow-
ing table shows the amount of time for evacuation:
Required time for evacuation
when 30 gal/h vacuum pump is used
If tubing length is
less than 49 ft.
45 min. or more
Evacuation is not necessary for the balance tube if
only 1 outdoor unit is installed.
If tubing length is
longer than 49 ft.
90 min. or more
Manifold valve
Pressure
Lo
gauge
Suction
tube
Discharge
tube
Liquid
tube
Balance
tube
37
Hi
Vacuum pump
Open
Close
Open
Outdoor unit
Close
Open
Close
Open
Close
Fig. 6-4

Hide quick links:

Advertisement

Table of Contents
loading