IBM 9117-MMB User Manual page 58

Ibm power supply user manual
Hide thumbs Also See for 9117-MMB:
Table of Contents

Advertisement

When placing the system into operating position, ensure that the cables at the back of the system do not
catch or bind as you push the system unit back into the rack.
1. Unlock the blue rail safety latches (A) by lifting them upwards. The rail safety latches are located near
the middle of the system.
Figure 39. Placing the system into the operating position
2. Push the system unit (B) back into the rack until both system-unit release latches have locked into
position.
3. Replace and tighten the two screws (if present) (A) that secure the system unit (B) to the rack.
Note: Replacing the two shipping screws is optional but should be done in geographic areas that are
prone to seismic activity.
4. Close the front rack door of the unit you are servicing.
46
Power Systems: Power supplies for the 9117-MMB, 9117-MMC, 9179-MHB, or 9179-MHC

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9179-mhb9117-mmc9179-mhc

Table of Contents