Equipment Control Module - Carrier Performance TP-PRH-A Installation Instructions Manual

Performance series edge thermidistat control
Hide thumbs Also See for Performance TP-PRH-A:
Table of Contents

Advertisement

Fig. 15 - - Equipment Control Module
5. Match and connect equipment wires to proper terminals of each connector
block.
6. Push any excess wire into wall and against Equipment Control Module. Seal
hole in wall to prevent air leaks. Leaks can affect operation and cause incor-
rect temperature and/or humidity measurement.
7. Attach 2- - wire pigtail to Equipment Control Module terminal block (termin-
als V+ and Vg). Attach 2- - wire pigtail to the back of the Display Module via
2 pin, keyed connector.
8. Reattach Display Module body to Equipment Control Module by first set-
ting on at top and then push bottom corners to snap into place. See Fig. 16.
22
A07219

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents