Single- -Piece Installation
The following steps should be followed for the installation of the single- - piece
configuration.
1. Remove cover from Equipment Control Module by pressing the two tabs on
the bottom edge and pulling away. Route wires through large hole in Equip-
ment Control Module. Level Equipment Control Module against wall (for
aesthetic value only - - Equipment Control Module need not be leveled for
proper operation) and mark wall through 4 mounting holes.
2. Drill two 3/16- - in. mounting holes in wall where marked. Thermidistat Con-
trol may be mounted to a standard junction box if desired. Hole pattern on
Equipment Control Module matches junction box mounting holes.
3. Secure rear plastic Equipment Control Module to wall with 4 screws and
anchors provided. To avoid unintended bending of wall plate plastic, use all
4 screws and anchors. Make sure all wires extend through hole in Equip-
ment Control Module.
4. Adjust length and routing of each wire to reach proper connector block and
terminal on Equipment Control Module with 1/4- - in. (6 mm) extra length.
See Fig. 15.
21