Required Components And Accessories Checklist - Amtrol BOILER MATE TD-41Z Installation, Operation & Maintenance Instructions Manual

Top-down indirect-fired water heaters with top-mounted coil
Table of Contents

Advertisement

3. REQUIRED COMPONENTS AND
ACCESSORIES CHECKLIST
TD-7Z, TD-41Z, TD-7ZDW, TD-41ZDW
The following is a checklist of components required for proper installation of these
BOILER MATE™ models, both Priority and Non-Priority:
A. Separate circulator
• 1 each - circulator (4-8 gpm)
• 1 each - positive shut-off weighted check valve
B. Use of heating system zone circulator
• 1 each - zone valve
C. Also Required:
• 4 each - unions
• 4 each - shut off valve
• 1 each - vacuum breaker
• 1 each - T & P relief valve (included)
• 1 each - A THERM-X-TROL
valve or pressure reducing valve is installed anywhere between the BOILER MATE™ and
the city main.
• As needed - pipe dope or Teflon tape
• Do not forget an EXTROL
side of your system.
If a steel hydropneumatic tank is in place, AMTROL recommends
replacing it with a properly sized EXTROL
significant heat transfer problems can occur by causing air to be trapped in the heat
exchanger. If the boiler system has an EXTROL
temperatures are being changed, resize the EXTROL
COMPONENTS CHECKLIST
®
expansion tank - REQUIRED IF a Back flow preventer, check
®
and thermal expansion - an expansion tank is required on the boiler
-5-
®
expansion tank. Otherwise,
®
expansion tank and the boiler
®
expansion tank.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents