4. Preparation of Pipe
Use a pipe cutter to cut the copper pipe.
Before Á aring, please put on the Á are nut.
Please use exclusive
tool
5. Pipe Connection
5.1 Pipe connection
Connecting the pipe to outdoor unit
(1) Remove the Á are nut and seal cap from the service valve.
(2) Apply refrigerator oil to the service valve and the Á ared portion
of the pipe.
(3) Using a wrench, security tighten.
In case of removing Á are nut of a indoor unit, À rst remove a nut of small diameter side, or seal cap of
large diameter side will Á y out. Free from water into the piping when working.
CAUTION
During connection, keep away from water.
Be sure to tighten the Á are nut to the speciÀ ed torque using a torque wrench. If the Á are nut is tightened
excessively, it may crack as time elapses, causing refrigerant leakage.
Please be careful when bending the copper pipe.
Screw in manually while adjusting the center. After that, use of torque wrench to tighten the connection.
Small diameter side
Large diameter side
Valve head
cap
Install the unit in a stable place to minimize vibration or noise.
After arranging the cords and pipes, secure them in place.
<
>
IA1030: A
CAUTION
Jagged edge will cause leakage.
Point the side to be trimmed downwards during trimming
to prevent copper chips from entering the pipe.
A (mm)
Outer
Diameter (Ø)
Imperial Á aring tool
~
6.35 (1/4")
0
0.5mm
~
9.52 (3/8")
0
0.5mm
~
0
0.5mm
12.7 (1/2")
Tighten all the way by hand.
Do not tighten all at once, but tighten it while
À tting the Á ared surface to the pipe.
Outer diameter of pipe (Ø)
Torque N·m (kgf · cm)
6.35 (1/4")
13.7-18.6 (140-190)
9.52 (3/8")
34.3-44.1 (350-450)
12.7 (1/2")
44.1-53.9 (450-550)
Small diameter side
6.35 (1/4")
19.6-24.5 (200-250)
9.52 (3/8")
19.6-24.5 (200-250)
Large diameter side
12.7 (1/2")
29.4-34.3 (300-350)
12.3-15.7 (125-160)
Valve core cap
Gas leakage inspection
Please use gas leakage detector to check if leakage
occurs
at connection of Á are nut as shown on the right.
If gas leakage occurs, further tighten the connection to
stop leakage. (Use the detector provided for R410A)
6. Removal Of Air From The Pipe And Gas Leakage Inspection
6.1 Air purging by using vacuum pump
Rigid Á aring tool
1.0mm
1.0mm
1.0mm
7. Operation test
Please ensure that the air conditioner is in normal operating condition during the operation test.
Explain to your customer the proper operation procedures as described in the user's manual.
If the indoor unit does not operate, check to see that the connections are correct.
Trial run should be conducted on one unit at a time to check for incorrect
wiring of connecting cord.