Finishing

A. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing closer than the minimums list-
ed must be constructed entirely of noncombustible materi-
als (i.e., steel studs, concrete board, etc.) Failure to comply
could cause fi re.
Combustible Mantels
Note: All measurements in inches.
1 INCH
MINIMUM
TO VENT PIPE
Figure 13.1 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
Combustible Mantel Legs or Wall Projections
TOP VIEW
Figure 13.2 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
CEILING
18
17
16
15
14
9-1/8
13
MIN.
12
11
10
3-1/8
9
8
7
3-7/8
6
5
TOP OF
TOP OF
UNIT
FINISHING STRIP
4 IN.
MINIMUM
UNLIMITED
Heat & Glo • Bravo • 704-902 Rev. J • 10/10
B. Facing Material
• Metal front faces may be covered with non-combustible
materials only.
• Facing and/or fi nishing materials must not interfere with
air fl ow through louvers, operation of louvers or doors,
or access for service.
• Facing and/or fi nishing materials must never overhang
into the glass opening.
• Observe all clearances when applying combustible
materials.
• Seal joints between the fi nished wall and appliance top
and sides using a 300 ºF minimum sealant. Refer to
31
Figure 13.3.
WARNING! Risk of Fire! DO NOT apply combustible
materials beyond the minimum clearances. Comply with
all minimum clearances to combustibles as specifi ed in
this manual. Overlapping materials could ignite and will
interfere with proper operation of doors and louvers.
FINISHING EDGE TRIM
COMBUSTIBLE MATERIALS
MAY CONTACT AND COVER
FRONT AND SIDE AREAS
BELOW GLASS/FRONT
Figure 13.3 Noncombustible Facing Diagram