Disassemble Vent Sections; Install Support Brackets - Heat & Glo 6TRSI-AUD Owner's Manual

Natural gas, propane or butane as a balanced flue heater
Hide thumbs Also See for 6TRSI-AUD:
Table of Contents

Advertisement

D. Disassemble Vent Sections
• Rotate either section (see Figure 10.10) so the seams
on both pipe sections are aligned as shown in Figure
10.11.
• Pull carefully to separate the pieces of pipe.
Figure 10.10 Rotate Seams for Disassembly
Figure 10.11 Align and Disassemble Vent Sections
46
Heat & Glo • 6TRSI-AUD, 6TRSILP-AUD • 2078-980 Rev. Q • 2/14
E. Install Support Brackets
For Horizontal Runs - The fl ue system must be supported
every 5 ft. (1.52 m) of horizontal run by a horizontal pipe
support. To install support brackets for horizontal runs:
• Place the pipe supports around the fl ue pipe.
• Nail the pipe supports to the framing members.
For Vertical Runs - The fl ue system must be supported
every 8 ft. (2.44 m) above the heater fl ue outlet by wall
brackets (see Figure 10.12). To install support brackets
for vertical runs:
• Attach wall brackets to the fl ue pipe and secure the wall
bracket to the framing members with nails or screws.
WALL STUD
FLUE
OUTLET
1 in. MIN.
(25 mm)
Figure 10.12 Installing Support Brackets
WALL BRACKET
8 FT.
(2.44 m)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6trsilp-aud

Table of Contents