Vent Clearances and Framing

A. Pipe Clearances to Combustibles
WARNING! Risk of Fire! Maintain air space clearance to
vent. DO NOT pack insulation or other combustibles:
• Between ceiling fi restops
• Between wall shield fi restops
• Around vent system
Failure to keep insulation or other material away from
vent pipe may cause over heating and fi re.
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
DVP heat shield - designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184
mm) thick.
required.
(DVP Pipe Shown)
Heat
Shield
3 in. (76 mm)
top clearance
1 in. (25 mm)
clearance around
vertical sections
Heat
Shield
* When using SLP pipe, minimum clearances from the vent pipe to combustible
materials at inside wall firestops are:
Figure 8.1 Horizontal Venting Clearances To Combustible
Materials
3 in. (76 mm)
top clearance *
Heat
Shield
1 in. (25 mm)
clearance
Wall
bottom & sides
Shield
Firestop
WALL
3 in. (76 mm)
top clearance *
Heat
Shield
1 in. (25 mm)
Wall
clearance
Shield
bottom & sides
Firestop
WALL
Top: 2-1/2 in. (64 mm)
Bottom: 1/2 in. (13 mm)
Sides: 1 in. (25 mm)
Heat & Glo • 6TRSI-AUD, 6TRSILP-AUD • 2078-980 Rev. Q • 2/14
B. Wall Penetration Framing
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield fi restop(s). The wall shield
fi restop maintains minimum clearances and prevents cold
air infi ltration.
• The opening must be framed on all four sides using the
same size framing materials as those used in the wall
construction.
• DVP pipe - A wall shield fi restop is required on one side
only on interior walls. If your local inspector requires a
wall shield fi restop on both sides, then both wall shield
fi restops must have a heat shield (refer to Section
16.B.) attached to them.
• See Section 10 for information for regarding the instal-
lation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by noncom-
bustible materials such as concrete, a hole with diameter
one inch greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall
shield fi restop is only required on one side and no heat
shield is necessary.
Note: A 6 in. (152 mm) section of straight fl ue must
be attached to the fi replace before a 90° elbow.
10 in.
254 mm
305 mm
10 in.
254 mm
305 mm
A*
B*
in.
6TRSI-AUD
6TRSILP-AUD
mm
1219
* Shows center of vent framing hole for top or rear venting. The center of
the hole is 1 in (25 mm) above the center of the horizontal vent pipe.
Figure 8.2 Wall Penetration
12 in.
C
D
12 in.
A*
B*
C
D
48
27-7/8
47
26-7/8
708
1194
683
37