Controller Operations; Operating The Controller - Lionel Silver Bell Express Owner's Manual

Silver bell express train set
Table of Contents

Advertisement

Controller operations

Operating the controller

A
s you turn the throttle control knob to the right, power to the track is increased. Refer to
Figure 5. When the indicator reaches the green band, there should be sufficient power to
operate the locomotive. The further into the green area the knob is turned, the faster your train
will go. Remember that the greater the load on the engine (adding more cars for the engine to
pull, for example), the further into the green the knob must be turned before it will operate the
locomotive.
The yellow band indicates the average power range that the train will be operating in. The red
band represents maximum power output.
Plug the power pack
into a standard wall
outlet
Plug this end
into the back
of the
controller.
Figure 5. Controller features
Parents should periodically inspect the power pack for potential hazards such as a broken or damaged
case and have it repaired or replaced. See the Lionel Service Station listing for information and the
address of the nearest Authorized Service Station. Or visit us on the Internet at www.lionel.com
The LED indicator shows when
your controller is on.
Turn the throttle control
knob to the right for more
power.
7
Green band
OFF
FULL
SPEED
Throw this switch to change
direction.
Yellow
band
Red
band

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

78-1024-250

Table of Contents