Step 4. Completing The Installation - Carrier Air V Owner's Manual

Carrier recreational vehicle air conditioner
Hide thumbs Also See for Air V:
Table of Contents

Advertisement

STEP 4 - COMPLETING THE INSTALLATION
To complete the installation and system checkout requirements, the following steps must be performed.
1
Check the thermostat probe position. Make sure
the thermostat probe is routed through the holding
guide and is not touching any metal surface.
2
Make sure the arm for the automatic air sweep
function and the filters are properly positioned in
the ceiling grille.
IF INSULATED CABLE IS NOT AVAILABLE, APPROPRIATE STRAIN
RELIEF CONNECTORS OR CLAMPS SHOULD BE USED.
THERE SHOULD BE NO CLAMPING OR PINCHING APPLIED
TO THE INDIVIDUAL SUPPLY LEADS.
4
5
Figure 6
3
4
Figure 7
Connect the power line to the black, white and
ground wires found in the junction box using three
wire connectors. CAUTION! - Connect black wire to
black wire, white wire to white wire and ground wire
to ground wire (green to bare copper). Using UL
approved electrician's tape, secure the wire
connectors in a workmanlike manner (See Figure 6).
Tighten the strain relief clamp to secure the supply wire.
DO NOT OVERTIGHTEN (See Figure 7).
Reinstall the junction box cover.
Secure the ceiling grille to the ceiling panel with 4
screws.
Turn on the power supply to the roof top air
conditioner.
'
S GUIDE - 11
OWNER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents