Heat & Glo RED60 Owner's Manual page 26

Installation and operation
Hide thumbs Also See for RED60:
Table of Contents

Advertisement

Figures 7.7, 7.8, 7.9 and 7.10 show possible framing
techniques.
WARNING! Risk of fi re and burns! DO NOT install PVI-
DVP with the access panel facing upward. Overheating
may occur.
Note: An 8 X 16 inch framed hole is required in front of the
access panel. This hole may be covered with an open air lou
vered cover.
WARNING! Risk of fire and burns! DO NOT install
PVI-DVP with the access panel facing upward.
Overheating may occur.
Figure 7.7 PVI-SLPMounted to Horizontal Surface
Note: AN 8 X 16 inch framed
hole is required in front of the
access panel.
This hole may be covered with
an open air louvered cover.
ACCESS PANEL
Figure 7.8 PVI-SLP Mounted to Vertical Surface
26
ACCESS PANEL
Heat & Glo • RED60 • 2159-900 Rev. B • 12/09
Note: AN 8 X 16 inch
framed hole is required in
front of the access panel.
This hole may be covered
with an open air louvered
cover.
Figure 7.9 Mount PVI-SLP to Chase
Figure 7.10 and Figure 7.11 show the proper installation
of the PVI-DVP if a louvered register is being used to
provide free air.
ADJUST BRACKET
TO SPECIFIED DEPTH
SHEETROCK
Figure 7.10 PVI-SLP Mounted with Fresh Air Access
SCREWS
CHASE
APPLIANCE
Note: If the access
cover is not louvered,
the 1/2 in. clearance
should change to a
minimum of 2 in.
1/2 IN. MAX. FROM
BACK OF OPEN
AIR COVER
LOUVERED OR
OPEN AIR WALL
COVER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents