Installing/Removing The Rack Model; Rack System Requirements - Fujitsu PRIMERGY TX150 S7 Operating Manual

Table of Contents

Advertisement

Hardware installation
4.3

Installing/removing the rack model

V
CAUTION!
Please observe the safety information and notes on rack mounting in
chapter
At least two people are needed to install / remove the server in the
rack. (For the Japanese market, please refer to " 安全上の注意および
その他の重要情報 ".)
The rack may tip over if more than one unit is removed at the same
time.
The server may not occupy the top height units of the rack
(38HU/42HU PRIMECENTER Rack, DataCenter Rack,
19-inch standard rack (for the Japanese market)),
as otherwise boards cannot be replaced even with the plug-in module
fully extended.
4.3.1

Rack system requirements

The rack systems from Fujitsu PRIMECENTER Rack, DataCenter Rack and
19-inch standard rack (for the Japanese market) support the installation of
PRIMERGY servers. Installation in most current rack systems from other
manufacturers (3rd party racks) is also supported.
To accommodate the ventilation concept and ensure proper ventilation, any
unused areas in the rack must be sealed using dummy covers.
The power is supplied via the multiple socket outlets fitted in the rack.
Fujitsu rack systems
The main features of PRIMECENTER Rack, DataCenter Rack and 19-inch
standard rack (for the Japanese market) are as follows:
– support systems that can be mounted without tools
– support systems having a linear alignment feature to ensure that they can
be adjusted to different rack depths
PRIMECENTER Rack and DataCenter Rack provide an enhanced cable
management in the lateral rack area.
TX150 S7
"Important information" on page
Operating Manual
Installing/removing the rack model
27.
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents