Ferroli OPTIMAX HE PLUS 25 S Instructions For Use, Installation And Maintenance page 12

Wall-mounted gas fired, pre-mix condensing system boiler
Table of Contents

Advertisement

The isolation valve kit shown in Fig. 11 is supplied as standard.
fig. 11
Make Up Water
Provision must be made for replacing water lost from the sealed system. Reference should be made
to BS6798, for methods of filling and making up sealed systems. There must be no direct connection
between the boiler's central heating system and the mains water supply. The use of mains water to
charge and pressurise the system directly, is conditional upon the Local Water Byelaws. Again any such
connection must be disconnected after use. Ensure the filling point is on the return pipe to the boiler.
Attention - is drawn to the Model Water Byelaws.
Key
1. C.H. filling valve.
2. Temporary connection.
3. Cold water supply valve.
4. Double check valve.
12
Key
A = Nut
B = Compression olive
D = 3/4” seal (green)
E = 1/2” seal (green)
F = 1/2” gas seal (blue)
G = Filter
H = Cap
D
A
B
Flow isolation valve
22
RED
F
A
B
22
D
A
B
G
22
BLUE
4
3
Cod. 3540R540 - 02/2009 (Rev. 00)
OPTIMAX HE PLUS 25 S
Gas isolation valve
YELLOW
H
Return isolation valve
2
Fig. 12
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimax he 25 s

Table of Contents