Thermal Solutions EVO-500 Installation, Operating And Service Instructions page 40

Evo series
Table of Contents

Advertisement

WARNING
The maximum operating pressure of this boiler
is 160 psig. Never exceed this pressure. This
boiler was supplied with a safety relief valve with
a pressure relief setting specified at the time of
purchase. The relief valve setting must be above
the maximum operating pressure of the system.
Consult Thermal Solutions if the desired system
operating pressure is above the safety relief
valve pressure setting. Do not plug or change
safety relief valve.
C.
Power the boiler - Turn on electrical supply to the
boiler and circulation system at fused disconnect
switches. Turn on control circuit breaker inside front
jacket panel. Note that there is electrical power at
certain components even with the boiler operating
switch off. See wiring diagrams in Figures 9a-9c.
D.
Power the Circulators - Turn system circulators on
and purge air from the boiler and system piping.
1. Confirm motor rotation on boiler and system
circulators.
2. Confirm that water flow switch is operating
properly.
E.
Pressurize the Fuel System - Turn on gas supply to the
boiler gas piping.
.
1
Confirm that the supply pressure to the gas regulator
supplied with the boiler conforms to Table 3 for
maximum and minimum supply pressures.
.
2
Open the manual gas shut-off valves located
upstream of the gas regulator supplied with the
boiler. Do not open manual gas valve inside of
boiler jacket.
DANGER
Do not use matches, candles, open flames or
other ignition source to check for leaks.
3. Using soap solution, or similar non-combustible
solution, electronic leak detector or other approved
method, check that boiler gas piping valves,
regulators and all other components are leak free.
Eliminate any leaks.
.
4
Purge gas line of air.
.
5
Reset low gas pressure safety switch.
F.
Turn the boiler operating switch to the on position.
G.
Check Blower Rotation - Remove air filter to expose
the fan blades.
1. Allow boiler to enter the sequence of operation.
2. While in Pre-Purge, position the flame control to the
test position.
3. Confirm proper blower motor rotation.
4. Shut boiler off and position the flame control back
to run. Reinstall air filter.
H.
Flame Safeguard Operation Check - Turn boiler
operating switch to the on position.
1. Allow boiler to complete prepurge and trial for
ignition period. Once pilot flame is recognized
by controller, position flame control switch to test
position.
.
2
Look through the boiler sight glass and confirm that
pilot flame is blue and steady and that the flame
signal is steady and between 1.5 and 5.0 volts DC.
On some boiler sizes, the pilot flame may not be
visible. In these cases, confirm proper flame signal
(as indicated above.)
3. Adjust pilot gas regulator until proper pilot manifold
gas pressure is achieved per firetest report label.
Pilot flame should be blue with very little yellow.
.
4
Turn the boiler off, place flame control switch in
"run" position, and repeat Steps H.1 and H.2 at least
five times until reliable pilot ignition and signal is
achieved and confirmed.
.
5
With the pilot operating properly, allow boiler to
continue to trial for main flame. Confirm that the
flame control locks out on main flame failure.
.
6
Open the manual main gas shut-off valve located
inside the boiler jacket. Using the procedure detailed
in Step E.3, leak test gas piping and valves upstream
of the boiler main gas valve. Eliminate any leaks.
.
7
Reset flame safeguard and allow boiler to run
through prepurge, trial for pilot and trial for main
flame.
8. Confirm that main flame ignites smoothly.
9. Observe main flame and confirm that burner
element is evenly orange without flickering.
10. Observe flame signal and confirm signal is steady
and between 1.5 and 5.0 volts DC.
11. Using the procedure detailed in step E.3, leak test
gas piping and valves downstream of the boiler gas
valve. Eliminate any leaks.
40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evo-1500Evo-750Evo-2000Evo-1000

Table of Contents