Download Print this page

HP ProLiant 585G5 Configuration page 33

Sap master configurations with hp proliant servers

Advertisement

Preface
The previous slides presented server- and storage characteristic information marked
by alphabetic letters for use in the following slides. By combining the specifications
from the T-shirt sizing data with the hardware data, you can build individual system
landscapes and/or size the required components. Configuration and budgeting
(German list price) details can be extracted from a separate Excel worksheet.
Extra information on the server systems:
As SAP (especially Java) generally allocates a huge amount of system resources, we
recommend to apply a minimum of 8- optimal 16 GB RAM per server system; as well as
for non-productive systems (behold server sizing categories A & I).
All systems should be configured with redundant options such as host bus controller; fans
and power supplies (see server configuration layout in the Excel sheet).
For booting from SAN, you have to plan internal server disks for the page file anyway,
otherwise performance problems will arise.
Extra information to the storage solutions:
Listed storage solutions are approved for running SAP; whereas in existing SAP
landscapes the majority is using our Enterprise Virtual Arrays (EVA).
© 2008 Hewlett-Packard GmbH (SAPCC Germany)
33
12/17/2008
The information contained herein is subject to change without notice
Directory
Applications
Technology
Solutions

Advertisement

loading