Care Of Glass And Plated Parts; Venting; Dimensions; Venting Lengths And Air Terminal Locations - Napoleon Torch GT8N Installation And Operation Instructions Manual

Vented gas fireplace
Table of Contents

Advertisement

The glass is 3/16" ceramic
glass, available from your
Napoleon® / Wolf Steel Ltd.
dealer. Clean the glass after
the fi rst 10 hours of operation
with a recommended gas
fi replace glass cleaner. Thereafter clean as required. DO NOT CLEAN GLASS
WHEN HOT! Do not use abrasive cleaners to clean plated parts. Buff lightly
with a clean dry cloth. If the glass is not kept clean permanent discolouration
and / or blemishes may result.
/
43
3
4
ELECTRICAL
ACCESS
The vent connection to the fi replace can be viewed by removing the baffl e from the top, inside of the fi rebox.
Use only Wolf Steel venting components. Minimum and maximum vent lengths, for both horizontal and vertical installations,
and air terminal locations for either system are set out in this manual and must be adhered to. Use only Wolf Steel Ltd.
fl exible vent components with the Wolf Steel Ltd. GD179 termination kit. This fi replace uses a 3" exhaust and a 5"
instake diameter coaxil vent system.
All outer pipe joints of these venting systems must be sealed using Red RTV and/or Mill Pac high temperature sealant (not
supplied) hereafter referred to as high temperature sealant W573-0002 (Red RTV) and the high temperature sealant W573-
0007 (Mill Pac).
For vent systems that provide seals on the inner exhaust fl ue, only the outer air intake joints must be sealed using a red high
temperature silicone (RTV). This same sealant may be used on both the inner exhaust and outer intake vent pipe joints of all
other approved vent systems except for the exhaust vent pipe connection to the fi replace fl ue collar which must be sealed
using the black high temperature sealant Mill Pac.
With fl exible venting, in conjunction with the GD178 wall terminal kit, use either the 5 foot vent kit GDT5 or the 10 foot vent
kit GDT10. These kits allow for extended horizontal venting of the fi replace.
When using approved Wolf Steel venting components, use only the following termination kits: WALL TERMINAL KIT GD178,
or 1/12 TO 7/12 PITCH ROOF TERMINAL KIT GDT110, 8/12 TO 12/12 ROOF TERMINAL KIT GDT111, FLAT ROOF
TERMINAL KIT GDT112.
Rigid and fl exible venting systems must not be combined. Wolf Steel and Simpson Dura-Vent venting systems must not
be combined.
Venting terminals shall not be recessed into a wall or siding.
For optimum fl ame appearance and fi replace performance, keep the vent length and number of elbows to a minimum.
The air terminal must remain unobstructed at all times. Examine the air terminal at least once a year to verify that it is
unobstructed and undamaged.
Provide adequate ventilation and combustion air. Provide adequate accessibility clearance for servicing and operating the fi replace.
Never obstruct the front opening of the fi replace.
NorthlineExpress.com

CARE OF GLASS AND PLATED PARTS

WARNING
!
Do not substitute materials. Use care when
handling glass components do not stike, or
slam shut. Do not operate with broken glass.
GAS LINE
ACCESS

VENTING

VENTING LENGTHS AND AIR TERMINAL LOCATIONS

http://www.northlineexpress.com

DIMENSIONS

/
1
4
37
/
3
4
5
FIGURES 1a-c
3" DIA.
5" DIA.
2
W415-0619 / B / 03.03.08
Toll-Free 1-866-667-8454

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Torch gt8p

Table of Contents