Sub-Zero 427G Installation Manual page 23

Wine storage
Hide thumbs Also See for 427G:
Table of Contents

Advertisement

Models 427G and 427RG Installation
Level the Unit
Level the wine storage unit by turning the front leveling
legs clockwise to raise or counterclockwise to lower the
unit. To assist you in adjusting the front leveling legs up or
down, use a standard screwdriver blade and place it in the
front leveling leg as shown in the illustration below.
The rear leveling legs are adjusted from the front of the
base by turning the Phillips head screw as shown in the
illustration below.
IMPORTANT NOTE: The rear leveling legs will only move
1
/
"
for every 18 revolutions on the Phillips head screw.
(2)
16
Do not over torque. Use the lowest torque setting on any
power screwdriver. Do not turn the rear leveling legs by
hand.
To reduce the possibility of the unit tipping forward, the
front leveling legs must be in contact with the floor.
Front leveling legs.
Rear leveling legs.
Molding Installation
Install the decorative white molding strips to the top and
sides of models 427G and 427RG for a finished look. The
top molding strip must be installed before the side
molding can be attached. The top molding strip is held in
place by double-sided velcro. The side molding strips
snap into place over brackets attached to the side of the
unit. Refer to the illustrations below for positioning. For
installations where units are side by side, refer to dual
installations on page 21.
If you choose, the molding strips may be painted to match
surrounding cabinetry. Follow these steps: Rough up the
surface to be painted with fine grit sandpaper. Wipe with
alcohol to ensure that the surface is clean and dry. Use an
appliance or industrial grade, oil base, high gloss enamel
paint.
TOP
MOLDING
Top molding.
subzero.com
SIDE
MOLDING
Side molding.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

427rg424g424fsgWs-30

Table of Contents