Making The Heating System Operational; Starting Up The Control And The Burner; Guidelines For Starting Up The Burner - Buderus Logano G215 US Installation And Maintenance Instructions Manual

Oil and gas-fired boilers
Hide thumbs Also See for Logano G215 US:
Table of Contents

Advertisement

Placing the boiler in operation
9.3

Making the heating system operational

Open fuel feed on the main shut-off valve.
Switch on the heating system emergency stop switch
(if installed) and/or switch the corresponding house
circuit-breaker.
9.4

Starting up the control and the burner

For further start-up steps, follow the burner start-up
sequence. Refer to the
Switch on the heating system with the control switch.
The burner starts if a heat demand is present or if you
switch the control panel to manual.
(
Logamatic service manual).
Select "Manual" operation
Set the required temperature at the boiler water
thermostat.
Switch control on (position "I").
9.5

Guidelines for starting up the burner

Allow burner to operate for 15 to 20 minutes before a
combustion test. Earlier combustion tests can lead to
incorrect readings as a result of burning off the sealing
rope. We recommend checking the burner after a few
weeks of operation.
NOTICE
Incorrect burner adjustment can cause
contamination of the boiler (e.g. soot)
Faults may occur more often than normal.
Always check combustion with the
following instruments.
Never adjust burner visually.
Required instruments:
– CO
measuring equipment
2
– Draft measuring equipment
– Oil pressure gauge
– Stack thermometer
– Smoke tester
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
burner documentation.
1
Fig. 60 Switching on the control (for example
Logamatic 2000)
1 Boiler water thermostat
2 Main control switch
9
2
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents