Size And Capacity Of Propane Cylinders Required - Mr. Heater MH55FAV Operating Instructions And Owner's Manual

Forced air propane construction heater
Table of Contents

Advertisement

SIZE AND CAPACITY OF PROPANE
CYLINDERS REQUIRED
The charts below show the approximate size of the cylinder
required for these heaters. To use the chart:
1. Select the lowest air temperature expected (at the bottom of
the chart).
2. Move straight up to time of operation desired (left side of
chart).
3. Read the cylinder size required.
All heaters should have:
full cylinders
good air circulation
no frost on cylinders
55,000 BTU/HR (16.1 kW)
AIR TEMPERATURE -
85,000 BTU/HR (33.4 kW)
AIR TEMPERATURE -
Mr. Heater | Forced Air Propane Construction Heater
o
o
F (
C)
o
o
F (
C)
7
125,000 BTU/HR (49.1 kW)
AIR TEMPERATURE -
Operating Instructions and Owner's Manual
Use liquid
withdrawal
and a vaporizer
o
F (
o
C)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mh85favMh125fav

Table of Contents