Download Print this page

Zanussi ZC 550 ML User Manual page 6

Gas cooker zc 550 ml; zc 550 mh

Advertisement

10
INSTALLATION
For the installer and qualified technicians
It is mandatory that all operations required for the installation and maintenance be
carried out by a competent gas installer and in accordance with existing rules and
regulations.
IMPORTANT
Before installing check that the technical features on the factory label suit to the
gas supplied.
This appliance is not connected to a chimney. It must be installed and connected
in accordance with the rules and regulation and the relevant codes of practice.
Comply with the regulations concerning ventilation.
PLACEMENT
The gas cooker must be installed in a well-ventilated kitchen, so as to comply with
regulation in force. The permanent openings for kitchen ventilation has to be 2 m
above the flooring, but avoid unbearable draught. The necessary air for
3
combustion is of 2 m
/h/kW (see the factory label)
When the appliance is installed near a furniture watch that the sides be not
0
inflammable, or they should resist 100
C .
In the build bellow the right placement of the appliance.
59 cm
2 cm
2 cm
11
CONNECTION TO THE GAS SUPPLY
The gas cooker can be connected to the gas supply on the right side. The gas
inlet on the appliance is a 1/2" gas parallel male type. There are 3 possibilities for
connecting
− rigid pipe with gasket.
− pipe with mechanical end.
− rubber hose pipe
In case of rubber hose pipe screw on the inlet the hose nipple corresponding to
the type of gas supposed to be used interspersing also a gasket.
B
A
C
E
A – Distributor pipe
B – Nut 1/2"
C – Gasket
D – Hose nipple
E – Elbow
C
D
Connection by rubber hose to gas supply has to be done so that it should not pass
behind the cooker.

Advertisement

loading