Unpacking And Installation; Unpacking; Installation - TRENDnet TE100-S16 User Manual

16-port 10/100mbps fast ethernet switch
Hide thumbs Also See for TE100-S16:
Table of Contents

Advertisement

U
NPACKING AND
This chapter provides unpacking and setup information for
the Switch.

Unpacking

Open the shipping carton of the Switch and carefully unpacks its
contents. The carton should contain the following items:
One the 16-port 10/100Mbps Fast Ethernet Switch
??
One AC power cord, suitable for your area's electrical
??
power connections
Four rubber feet for shock cushioning
??
Screws and two mounting brackets
??
This User's Guide
??
If any item is found missing or damaged, please contact your local
reseller for replacement.

Installation

The site where you install the Switch stack may greatly affect its
performance. When installing, consider the following pointers:
Install the Switch in a fairly cool and dry place. See Specifications
for the acceptable temperature and humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.
Leave at least 10cm of space on the left and right hand side of the
Switch for ventilation.
I
NSTALLATION
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents