Table of Contents

Advertisement

Std. secondary spring preload:
160
0
(Twist augle)
6.
Install the key in the jackshaft, and
install
the fixed sheave. Grease the
indicated point.
4-6. CHAIN CASE
7. Install the washer and securing nut.
Torque the nut to specification.
Tightening torque:
4.0 rn-kq (29 ft-lb)
8. Wipe both sheaves. They should be free
from oil and grease.
4-10

Advertisement

Table of Contents
loading

Table of Contents