Maytag MEDE251YG1 Installation Instructions Manual page 12

Electric dryer
Hide thumbs Also See for MEDE251YG1:
Table of Contents

Advertisement

Connect
neutral
ground wire and
neutral
wire
Connect neutral ground wire (E) and place hooked end (hook
facing right) of neutral wire (white or center wire) (C) of direct
wire cable under center screw of terminal block (B). Squeeze
hooked ends together and tighten screw.
3oWIRE
DIRECW
WIRE
CONNECTION
Use where local codes permit connecting
cabinet-ground
conductor
to neutral
wire.
f
"1, Prepare
your 3-wire cable for
direct
connection
Direct wire cable must have 5 ft. (1.52 m) of extra length so
dryer may be moved if needed.
Strip 31/2" (89 mm) of outer covering from end of cable. Strip
insulation back 1" (25 mm). If using 3-wire cable with ground
wire, cut bare wire even with outer covering. Shape wire ends
into hooks.
Attach
hooked
wires to terminal
block
Connect ground wire (green or bare) (F) of direct wire cable
to external ground conductor screw (A). Tighten screw.
Connect
remaining
wires
Place hooked ends of remaining direct wire cable wires under
outer terminal block screws (hooks facing right). Squeeze
hooked ends together and tighten screws. Finally, reinsert tab
of terminal block cover into slot of dryer rear panel. Secure
cover with hold-down screw. Now, go to "Venting Requirements."
To connect wires to terminal block, place hooked end of
wire under terminal block screw, facing to the right, squeeze
hooked end together and tighten screw.
Remove
center
screw
Remove center terminal block screw (B).
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents