Download Print this page

Labconco Purifier 3970200 User Manual page 9

Vertical clean benches

Advertisement

C
C
H
A
H
A
P
P
R
E
R
R
E
Before you install the Vertical Clean Bench, you need to prepare
your site for installation. You must be certain that the area is level
and of solid construction. In addition, a dedicated source of
electrical power should be located near the installation site to
power the Clean Bench, and other apparatus. Additionally, the
enclosure should be strategically placed in the lab to provide
efficient workflow.
Carefully read this chapter to learn the requirements for your
installation site:
• The support, vibration and movement requirements.
• The location and air current requirements.
• The exhaust and blower requirements.
• The electrical power requirements.
• The space requirements.
Refer to Appendix B: Dimensions for complete Vertical Clean
Bench dimensions.
Refer to Appendix C: Vertical Clean Bench Specifications for
complete Vertical Clean Bench electrical and environmental
conditions, specifications and requirements.
Product Service 1-800-522-7658
2
2
P
T
E
R
P
T
E
R
E
Q
U
I
S
I
T
R
E
Q
U
I
S
I
T
E
S
E
S
5

Hide quick links:

Advertisement

loading
Need help?

Need help?

Do you have a question about the Purifier 3970200 and is the answer not in the manual?

Questions and answers