Download Print this page

Mitsubishi Electric MXZ-3B30NA Installation Manual page 8

Split-type air conditioners
Hide thumbs Also See for MXZ-3B30NA:

Advertisement

Available languages

Available languages

5=1. PUMPING DOWN
When relocating or disposing of the air conditioner,
pump down the system following the procedure
below so that refrigerant
is not released into the atmosphere.
1) Connect the gauge manifold valve to the service port of the stop valve on the gas pipe side of the outdoor unit.
2) Fully close the stop valve on the liquid pipe side of the outdoor unit.
3) Close the stop valve on the gas pipe side of the outdoor unit almost completely
so that it can be easily closed fully when the pressure gauge shows 0 MPa [Gauge]
(0 Ibf/in? [0 kgf/cm2]).
4) Start the emergency
COOL operation on all the indoor units.
To start the emergency
operation
in COOL mode, disconnect
the power supply plug and/or turn off the breaker. After 15 seconds, connect the power supply plug
and/or turn on the breaker, and then press the E.O. SW once. (The emergency
COOL operation can be performed continuously
for up to 30 minutes.)
5) Fully close the stop valve on the gas pipe side of the outdoor unit when the pressure gauge shows 0.05 to 0 MPa [Gauge] (approx. 7.25 to 0 Ibf/in 2 [0.5 to 0 kgf/cm2]).
6) Stop the emergency
COOL operation.
To stop operation,
press the E.O. SW several times until all LED lamps turn off. Refer to operating
instructions
for details.
II
En-7

Advertisement

loading

This manual is also suitable for:

Mxz-4b36naMxz-3b24na