Standard Duct Connector Installation - Nordyne M1B Installation Instructions Manual

Downflow, direct vent (sealed combustion) forced air gas & oil furnaces
Table of Contents

Advertisement

201"
_
14 1/2"_
2 3/4"
C'_
J
Z
CUT-OUTFOR
1 3/4"
I
_
I
CL
¢'-
/
OPTIONAL
¢_
/
1 3/4"_i:
: : : _
:A:L; :F; ELIL,; E _ _'
3/4"_
_
ENTRY
1 1/4" Dia,
\\
LINE
1 7/8"_
_
FURNACE
2 7/8"_
_
DOOR
Figure 6. Cut=Out Dimensions
for
Standard Duct Connectors
±
_J_/_
FLOOR
OPENING
!._'
"X"
_
_,/,I
FLOOR
CAVITY
Figure 9. Floor Cavity
if Floor Cavity
"X" is:
7/8"/(22)
2"/(51)
4-1/4" / (108)
6-1/4"/(159)
8-1/4" / (210)
10-1/4" / (260)
12-1/4"/(311)
Duct
Connector
Type & Part Number
Standard Duct
901987A
901988A
901989A
901990A
901991A
901992A
901993A
Round Duct
904008
904009
904010
904011
904012
904013
904014
Note: Dimensions shown as Inches / (Millimeter_
Table 3. Duct Connector
Sizes
Figure 7. Cut=Out Dimensions
for
Round
Duct Connectors
Hole for
Gas Line
Mounting
Plate
Duct
Connecto
Figure 8. Standard
Duct Connector
In-
stalled
Standard
Duct Connector
installation
The standard duct connector is designed for use
on ducts 12" in width. However ducts narrower
than
12" may not allow sufficient
clearances
for this type of installation.
For an alternate
installation
method, see page 10.
1. Center the duct connector in the floor opening
with bottom tabs resting on top of the supply
air duct.
2. Mark the cut-out area on the supply air duct by
tracing around the connector tabs (Figure 8) of the
duct connector.
3. Remove the duct connector
and cut out the
marked area of the supply air duct 1/4" larger
the actual cutout drawn.
4. Install the duct connector
back in the floor
opening with the bottom tabs extending
into
the supply air duct.
5. Install the mounting
plate (Figure 8) under
the back side of the duct connector. Align the
screw holes in both components.
6. Secure the duct connector and the mounting
plate to the wood floor with appropriate
size
screws.
7. Bend the connector
tabs on the bottom of
the duct connector
upwards and as tight as
possible against the supply air duct.
8. Bend both tabs on the mounting plate up 90 ° .
See Figure 10, (page 10)
9. Seal all connections
with industrial
grade
sealing tape or liquid sealant.
NOTE:
Requirements
for sealing
ductwork
vary from region to region. Consult with local
codes for requirements
specific to your area.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents