Final Checklist; Operation - GE JDS28 Installation Instructions Manual

Hide thumbs Also See for JDS28:
Table of Contents

Advertisement

Installation
Instructions
FINAL CHECKLIST
= Check
to make sure the circuit
breaker
is closed
(Reset)
or the circuit
fuses
are replaced.
g Be sure
power
is in service
to the building.
g Check
to be sure that
all packing
materials
and tape
on metal
panel
(if applicable)
under
control
knobs
and drawer
have
been removed.
OPERATION
CHECKLIST
• Check
to make sure the
Clock display
is energized.
If a series
of horizontal
red lines
appear
in
the display,
disconnect
power
immediately.
Recheck
the range wiring
connections.
If change
is
made
to connections,
retest
again.
If no change
is required,
have
building
wiring
checked
for
proper
connections
and voltage.
It is recommended
that
the clock
be changed
if the red lines
appear.
• Push down
and turn
any one of the four
surface
knobs to "MED"
setting
to observe
that the
element
glows
within
15 seconds.
Turn the knob off when
glow
is detected.
If the glow
is not
detected
within
the time
limit,
recheck
the range wiring
connections.
If change
is required,
retest
again.
If no change
is required,
have
building
wiring
checked
for proper
connections
and voltage.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jdp39

Table of Contents