Download Print this page

GE Monogram ZV1050 Installation Instructions Manual page 7

42" island vent hood
Hide thumbs Also See for Monogram ZV1050:

Advertisement

Installation
Instructions
[STEP 11CONTINUED
• Arrange
cross fl'aming
in the ceiling
to suit the
existing
structure.
See examples.
- Secure
each
2 x 4 block with at least four
(4), #10
wood
screws,
3" hmg
(not supplied).
Use 8 wood
screws total for the two supports.
• The cross framing
must
be accurately
aligned
to
assure correct
positioning
of the hood.
• The cross framing
must be level in all directions.
Check
with a spirit
level and a(!just if necessary.
IMPORTANT:
The ceiling structure must be capable of
supporting the weight of the hood (approximately 300 pounds) and
any inadvertent user contact loads. The hood support frame will
be supported bythe 2 x 4 min. cross framing.
2x 4 Min.
CrossFraming
0-
Ii
i
i i
Ceil
_7-1/4_
Joist
11-1/4 '-_'_"
• Support
Frame
UpperHalf-
Opening
OfSupport
Frame
'-Height
Adjustment
Slot
Ductwork
• Use the shortest
and
straightest
duct route
possible.
For satist, mtory pertormance,
duct
run should
not
exceed
100 feet equivalent
length
tor any duct
configuration.
• Reter
to "Duct Fittings"
chart
to compute
the maxi-
mum
permissible
length
for duct runs to the out-
doors.
• This vent hood
must
use 8" round
duct. The
8"
round
duct can transition
to 3-1/4"
x 12".
• Install
the house
ductwork
to run horizontally
between
ceiling.joists
or straight
up through
the roof.
Finish the Ceiling
• Finish
the ceiling
surtace.
Be sure
to mark
location
of the ceiling.joists
and cross fl'aming.
Check
to be
sure the ceiling
is level,
use shims if necessary.
CeilingJoint
//
2x4
VentStraight Up
ThroughThe Ceiling
8"Round
Flat
Standing
*Vent Between
Ceiling Joists
*Depending
on available
space.

Advertisement

loading