Download Print this page

GE Monogram ZV1050 Installation Instructions Manual page 10

42" island vent hood
Hide thumbs Also See for Monogram ZV1050:

Advertisement

Installation
Instructions
ISTEP 61 SECURE WIRING
• Route
house wiring
through
the ceiling
hole and
pull a length
to reach
the hood junction
box,
approximately
6" below
the support.
fy,ing
View
Support
Frames
_______Tape
House
-_
Wiring
• Tape the _dre to the left side of the fl'ame
support
to pre_ent
damage
during
installation
aI'ld
ser',ice,
ISTEP 71
SIZE AND INSTALL
DUCTWORK
Duct C onnection
ToHood
Side
View
Support
Frame
T
Bottom Support
Frame F lange
Re red
Duct
Duct
Dim.A
Length
• Measure
fl'om house
duct flange
to bottom
of support
fl'ame.
Dim. A
- Add at least l" fl)r duct
overlap
at the top.
- Subtract
1-3/4"
for hood
insertion
into
the bottom
of the fl'ame
to determine
required
duct length.
• Cut the 8" duct length
required.
Note:
The bottom
of the duct must be external
(female)
c(mnecti(m
to the top of the hood.
The
b()ttom
end
sh(mld
be flared
slightl>
to tacilitate
installation
of the
hood.
• Install
duct
tip through
support
fl'ames
and
attach
to
house
ducting
with sheet
metal
screws.
• Seal the c(mnection
with duct tape.
10

Advertisement

loading