Download Print this page

GE ZV950 Installation Instructions Manual page 7

36" stainless steel vent hood
Hide thumbs Also See for ZV950:

Advertisement

installation Preparation
TOOLS AND MATERIALS
REQUIRED
{NOT SUPPLIEDI
. Tapemeasure
Knife
Spirit level
Wire cutter/stripper
Wire nuts
Electric drill with 1/8"and 3/8" bits
Phillips and flat blade screwdrivers
. Hammer
. Pliers
. Safety glasses
. Duct tape
.Tape to mount template
. Gloves to protect against sharp edges
.120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded
branch circuit.
. Strain relief for junction cover.
.8" round metal duct, length to suit installation.
REMOVE THE PACKAGING
The vent hood
is shipped
secured
to a shipping
board
with a shipping
bracket
and 4 screws.
* Remove
the duct cove_, parts
box and
other
packaging.
* i,if_ the hood
out of the box.
* Remove
and properly
discard
the plastic
wrapping.
TopOt Hood
//
'_ /
/
/
Junction
TopShippingScrews
Box
ScrewsandShippingBracket
* Locate and remove 2 screws at the top of the hood.
Remove 2 screws at the bottom
behind
the filter
guides on the left and right sides. Remove the
shipping bracket fiom behind
the blower housing.
Discard the shipping
bracket and board.
* Removej unction box cover
* Install strain relief into junction
box cover.

Advertisement

loading