Download Print this page

GE ZV950 Installation Instructions Manual page 10

36" stainless steel vent hood
Hide thumbs Also See for ZV950:

Advertisement

Installation instructions
iNSTALL DUCT BRACKET
The
duct
bracket
must
be installed
against
the
ceiling.
This
bracket
will hold
the
decorative
duct
cover
in place
at the
top.
* Install
the
2 small
screws
into
the
sides
of the
duct
bracket.
Remove
the
screws.
Pre-tapping
the
holes
will
insme ease of final installation.
Pre-Tap I
I
I
I Pie-Tap
Side '
'Side
Screw
Screw
Secure the bracket to the ceiling and wall:
* Mark tile 4 screw hole locations.
* Drill 1/8" pilot holes in marked bracket location.
* If pilot holes do not enter studs, enlarge
tlle holes to
3/8" and install wall fastener anchors.
* Drive screws, by hand, into the fasteners to allow
anchors to expand. Remove tlle screws.
* Secure tlle bracket to the ceiling and wall with wood
screws and/or
fasteners.
iNSTALL THE HOOD
Place the hood on the brackets and slide lef_ to right
to align with rectangular
slots at the top.
* A( 0 ust the installation
height by tightening
or
loosening
the screws '%" at the bottom
of the brackets.
* Align the hood lower mounting
holes with pilot holes
in the wall.
* Using two large fiat washers (supplied),
install wood
screws or wall fastener
screws, loosel 5 into lower
mounting
holes. Do not tighten.
LowerMounting Holes
Bracket Tabs
/
Screws _,
/
"B"
_
/
',,
/
* Level the hood by tightening
or loosening
the screws
"A" located on the bottom
mounting
brackets.
* Tighten lower mounting
screws.
* Tighten screws "g" located at the top of the mounting
bracket against the hood to clamp the position.
Do not overfighten
screws.
10

Advertisement

loading