GE Monogram ZV48T Installation Instructions Manual page 12

30", 36", 48" professional vent hoods
Hide thumbs Also See for Monogram ZV48T:
Table of Contents

Advertisement

mnstaaiation
mnstructions
ISTEP 2B] AJtemate
Mounting
Method
iNSTALL
HOOD TO SOFNT OF{ BENEATH CABINETS
• The
2 x 4 studs
must
be located
as sho_]]
im] the
chart,
Dh//.
A.
to accept
moHmlt]mlg
screws.
"A"
"B"
Centerliee to Stud
Hood Width
and Keyhome Slots
At the Top
ZV48T
19-9/1 if'
40"
ZV48S
23-9/1ff'
47-15/16"
ZV36T
13-9/1ff'
28"
ZV36S
17-9/1ff'
35-15/W'
ZV30T
10-9/1 if'
22"
ZV30S
14-9/1ff'
29-15/W'
7-1/2"
Back of Hood
• [)]'ill
l/8"
pilot
holes
intotl/esmdsattl/elocathms
sho_m]
im] the
top
_ie_
illustration.
mMPORTANT:
Soffit
framing
must
be capabme
of supporting
up to 150 mbs.
mnstamm
Transition
Onto Top of Hood
IN PO£TANT: Remove
s!-fipping tape from
damper and check that
damper moves freely,
Duct
Transition
• Place
the
O'ansition
piece
over
the
hood
exhaust
mid
secure
_ ]th 4 scre_
s provided.
Use
d_ct
tape
to seal the
com]ect]oi].
C]/eck
to be sm'e
the
damper
m ores
f}'ee]v.
Mount Hood onto Soffit or Cabinet
Note:
}[[ mom]ti_]g
to the u_]de]'side
of a cabi]let
",_it]/ a
Engage Top
KeyholeSlots 1/4" Gap
PushBack_1_
to Wall
i
i
Add Shims
I If Bottom
l ls Recessed
Drive
mom]ti_]g
scre_sinto
the
studs
m]ti]
thev
protrude
1/4".
The
1/4"
gap
_111 provide
c]earance
to
e_]gage
the
kev]]o]e
slots
hi the
top
of the
hood_
i,ift
hood
to insta]]atio_]
positiou.
Locate
h<mse
_]rh]g
mldro_te
thro_gh
thek]]ocko_t
({}'ore
the
back
or
top
of the
hood).
* I,]ft hood
onto
mom/ting
scre_s.
S]]de
back
agah]st
the
rear
_ a]].
*
Tigh
tell
0/O
_1_1 [i _1 g
sere'v,
s.
][MPORT_T:
For additional
support
and to mini-
mize %bration
during
operation,
the hood
must be
secured
to the back wall, Use wall anchors
to fasten
bottom
back of bood
to the wall.
12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Monogram ZV48T and is the answer not in the manual?

Table of Contents