Bosch HDS7132U-01 Installation Instructions Manual
Bosch HDS7132U-01 Installation Instructions Manual

Bosch HDS7132U-01 Installation Instructions Manual

Freestanding dual fuel range
Hide thumbs Also See for HDS7132U-01:

Advertisement

YOUR
LIFE.
OUR
INSPIRATION,
Freestanding
Dual Fuel Range
Safety .........
I
Preparation ......
3
Installation ......
5
Final Steps
7

Advertisement

Table of Contents
loading

Summary of Contents for Bosch HDS7132U-01

  • Page 1 YOUR LIFE. INSPIRATION, Freestanding Dual Fuel Range Safety ..Preparation ..Installation ..Final Steps...
  • Page 3: Safety Instructions

    Important Safety Instructions ,,, Our Table of Contents Important Safety Instructions ..................Preparation ........................Installation ........................Final Steps ........................Please read all instructions before using this appliance, PARTS PROVIDED: Removealltapeand packaging before using the range, Destroy the carton and plastic bags Anti-Tip Bracket after unpacking the range.
  • Page 4 Your Life ... IIvIPORTANT SAFETY INSTRUCTIONS WARNING For Massachusetts Installations: Before installing, turn power OFF at the service 1 Installation must be performed by a qualified or panel. Lock service panel to prevent power from licensed contractor, plumber or gas fitter qualified being turned ON accidentally.
  • Page 5: Install Ventilation

    Steps 1 through 4: Preparation 1. Install Ventilation Bosch strongly recommends the installation of a ventilation hood above this range. For most kitchens a certified hood rating of not less than 300 CFM is recommended. The range hood must be installed according to instructions furnished with the hood.
  • Page 6: Step 5: Prepare Electrical Connection

    General Information area where local codes prohibit grounding through the neutral conductor. Bosch recommends that the range be installed with a power cord set (not supplied)*. The electrical rating of the For installations where grounding through the neutral power cord set must be 120/240 volt, 30 amperes...
  • Page 7: Connect Electric

    Connect Electric Step 6: Installation Three Wire Connection The Four Wire Connection is preferred, but where local codes and ordinances permit grounding through neutral and/or conversion to four wire is impractical, unit may be connected to the power supply via a three wire connection.
  • Page 8: Step 7: Installation

    Your Life ... Step 7: Installation = Connect Gas Supply Test for Gas Leaks Leak testing is to be conducted by the installer according to the instructions given in this section. Turn on Gas. Apply a non-corrosive leak detection fluid to all joints and fittings in the gas connection between The gas connection is located below the back panel of the shutoff valve and the range.
  • Page 9 Further adjustment is required. YellowTips on Outer Cones: Normal for LP Gas. Soft Blue Flames: Normal for Natural Gas. Figure :[3 Replacement Parts: Visit your Bosch dealer for replacement parts. For a dealer near you contact Bosch Service at 800-944-2904. English • 7...
  • Page 10 CA 92649, For the most up to date critical installation dimensions by fax, use your fax handset and call 702/833-3600, Use code #8030, BOSCH 5551 McFadden Avenue, Huntington Beach, CA 92649 ,, 800-944-2904. 5060003403 Rev. B (ECO# 5V02EM, 5V026Q) 05/04 • © BSH Home Appliances Corporation...

This manual is also suitable for:

Hds7052u-01Hds7022u-01Hds7062u-01Hds series

Table of Contents