Exterior Factory Built Chimney; Hearth Stove Positive Connection - Lopi Patriot Owner's Manual

Wood-burning stove
Hide thumbs Also See for Patriot:
Table of Contents

Advertisement

Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Minimum Air Space to
Combustibles (See
Chimney Manufacturer's
Instructions - usually 2")
Min. 18"
clearance
to ceiling
Chimney Connector
Sections
Floor Protection
(See the section
"Floor Protection
Requirements" for
more details)
NOTE: This installation may be
used with a masonry or zero
clearance (metal) fireplace. The
requirements in the section
"Masonry Fireplace Requirements"
or "Zero Clearance (metal) Fireplace
Requirements" must be fulfilled prior
to installation.
Combustible
Mantle
Min. 18"
Floor Protection
(See the section
"Floor Protection
Requirements" for
more details)
}
Wall Bands
and Supports
tove Clearances
See the section "Stove
lacement Requirements"
or more details)
Follow the chimney
manufacturer's
instructions and
clearances for roof
penetrations. A storm
collar and flashing are
required (some require
a radiation shield).
Minimum 15'
Maximum 33'
Insulated Tee
(with cleanout )
ollow the chimney
anufacturer's
nstructions and
learances for wall
enetrations. A wall
adiation shield
thimble) is required.
ptional
nsulated
hase
Cap (prevents water
from entering)
Flue Liner
The liner must be
stainless steel connector
or flexible vent. Follow
the liner manufacturer's
instructions for
installation and support.
Airtight Insulated
Clean-Out
Remove damper
or wire it open
See the section
"Stove Placement
Requirements" for
minimum clearances
required.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents