Installation Diagrams - Mira events XS Installation & User Manual

Surface mounted all-in-one manual power shower
Table of Contents

Advertisement

4. Installation Diagrams

To prevent operational difficulties, the feed from the cylinder should be as illustrated
below. Side entry cylinder bosses are not recommended because:
A drop in cylinder water level could expose a top entry immersion element if
fitted.
Air-in-water solution gathers at the edge of the cylinder and in the centre, during
the heating process before travelling up the vent.
25 mm
minimum
Minimum
1.0 m Head
Minimum
22 mm
Isolating Valve
A high level hot feed pipe run as illustrated below will result in air locking and should
be avoided.
Other Cold
*
Draw Offs
*
A
Warning pipe
Cistern
Vent
80 mm Head
Pipe
B
D.H.W.
Hot
o
60
C
Supply
Other Hot Draw Offs
Correct Installation
Hot Feed Pipe Run
Cistern
Vent
Pipe
Side
D.H.W.
Entry
60
o
C
Boss
Other Hot
Draw Offs
Incorrect Installation
Minimum
Hose
Retaining
Ring
High-level
Isolating Valves
Hot
Supply
Cold
*
Supply
*
This layout is not suitable
for the Mira Extreme.
*Incorrect supply
connections
A
Cylinder Feed
Cold Pump Feed
B
Vent
o
90
o
o
30
–60
missing
Hose retaining
ring missing
Strained Hose
Warning
pipe
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents