Crestron GLS-EM-MCU Operation Manual page 16

Crestron green light power meter control unit
Table of Contents

Advertisement

Crestron Green Light
Program Manager
12 • Crestron Green Light
®
Power Meter Control Unit
2.
If additional GLS-EM-MCU devices are to be added, repeat step 1 for each
device. Each GLS-EM-MCU is assigned a different IP ID number as it is
added.
3.
If necessary, double click a device to open the "Device Settings" window
and change the IP ID, as shown in the following illustration.
"Device Settings: Crestron GLS-EM-MCU" Window
NOTE: The ID code specified in the SIMPL Windows program must
match the IP ID of each unit. Refer to "Identity Code" on page 10.
Program Manager is the view where programmers "program" a Crestron control
system by assigning signals to symbols.
The symbol can be viewed by double clicking on the icon or dragging it into Detail
View. Each signal in the symbol is described in the SIMPL Windows help file (F1).
®
Power Meter Control Unit: GLS-EM-MCU
Crestron GLS-EM-MCU
Operations Guide – DOC. 7294B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green light gls-em-mcu

Table of Contents