Kohler Command CV17 Service Manual page 31

Vertical crankshaft
Hide thumbs Also See for Command CV17:
Table of Contents

Advertisement

Installation
1. Apply pipe sealant with Tefl on
Thread Sealant or equivalent) to threads of switch.
2. Install switch into tapped hole in breather cover.
3. Torque switch to 4.5 N·m (40 in. lb.).
Testing
Compressed air, a pressure regulator, pressure gauge,
and a continuity tester are required to test switch.
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate continuity (switch
closed).
2. Gradually increase pressure to switch. As pressure
increases through range of 3-5 psi tester should
indicate a change to no continuity (switch open).
Switch should remain open as pressure is increased
to 90 psi maximum.
3. Gradually decrease pressure through range of 3-5
psi. Tester should indicate a change to continuity
(switch closed) down to 0 psi.
4. Replace switch if it does not operate as specifi ed.
24 690 07 Rev. B
(Loctite
PST
592™
®
®
®
KohlerEngines.com
Lubrication System
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents