System Operation; Pre-Start Checklist - Nordyne 13 Seer User's Manual And Installation

13 seer single package air conditioner
Table of Contents

Advertisement

Control Wire Legend
Green - Blower Relay
Red - Transformer
24V
Yellow - Cooling 1st
Stage
Brown - Heating 1st
Stage
Orange - Heating 2nd
Stage
Optional
Outdoor Thermostat
(Field Supplied)
a positive means of preventing simultane-
ous operation of the heating and cooling
units. The thermostat is also equipped with
an ON-AUTO fan switch which allows the
home owner to operate the indoor blower
when air circulation is desired.
Connect the red, yellow, green and brown
low voltage wires to the R or RC, Y, G and
W terminals respectively on the thermostat
base. The black wire is the 24 volt common
required on some thermostats. See ther-
mostat instruction sheet for more detailed
information.
Refer to furnace installation instructions
for required connections and proper heat
anticipator setting when installing unit with
an external furnace.
c.
If two stage heating is desired, an
optional outdoor thermostat may be
installed: Connect the thermostat to the
orange low voltage wire and the W terminal
on the indoor thermostat base (See Figure
10). See the thermostat instructions for
details on setting the outdoor thermostat.
4 Wire Heat/Cool Thermostat
Single Stage Electric Heat
RED
R
Y
YELLOW
GREEN
G
W
BROWN
ORANGE
Two Stage Electric Heat
RED
R
YELLOW
Y
GREEN
G
W
BROWN
ORANGE
Figure 10. Low Voltage Connections
4.
The air conditioner is shipped without an auxil-
iary electric heat kit installed. If electric heat is
desired, an accessory Heater Kit must be fi eld
installed. See Specifi cations Sheet for available
kits and their applications.

SYSTEM OPERATION

1.
The following check list should be observed prior
to starting the unit.
2 Wire Cooling Thermostat
R
Y
ELECTRIC HEAT PACKAGE (OPTIONAL)
Select the correct size heat package for the
installation.
Follow installation instructions provided with
each heater kit.
Installation is most easily accomplished
before making duct or electrical connec-
tions.
The blower must be set to high speed for
electric heat operation.
PRE-START CHECK LIST
Is the unit level? It should be level or slightly
slanted toward the drain for proper conden-
sate drainage.
RED
YELLOW
GREEN
BROWN
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents