Shut-Down
Shut-Down Instructions
1.
Turn the "On/Off" Ball Valves on the Air Manifold to
their "Off" position.
2.
Turn catalyst yellow ball valve, P/N 21228-00 to
Open / Recirculation position to dump psi. and close
the valve.
2.
Pressure should be maintained on the material hose.
procedures.
Material Pump should be stopped with Pump Shaft in
UP position. Shaft should be cleaned of any over-spray
or foreign material.
Material Pump Lube Cup should be emptied, cleaned
material.
Material Pump should now be cycled so that shaft is
left in DOWN position during shut-down period.
GC-1392Z
Pump Seals.
19