Horizontal Flue Installation - Ferroli OPTIMAX HE PLUS 18 OV Instructions For Use, Installation And Maintenance

Wall-mounted gas fired, pre-mix condensing gas boiler
Hide thumbs Also See for OPTIMAX HE PLUS 18 OV:
Table of Contents

Advertisement

Connection with concentric flue system
The unit can be connected to a concentric air/flue duct with a Horizontal or Vertical outlet as shown on
the following drawings. Numerous accessories are available on request to meet the various installation
requirements. Please refer to our "flue manual" or the price list.
View from above
fig. 17a

Horizontal flue installation

1. Define the position for installing the unit.
2. If using standard flue (041025G0) this must be installed level, for non-standard flue lengths over 1mtr
a fall of 3 mm per metre should be incorporated back to the boiler.
3. Make a hole of diameter 10 - 20 mm greater than the nominal diameter of the concentric pipe used.
4. If necessary, cut the terminal length to size, ensuring that the external pipe protrudes from the wall
by between 10 and 60 mm (fig. 17a and 17b). Remove the cutting burrs.
5. Connect the flue to the boiler, positioning the seals correctly. Seal the flue into the wall with silicone
or sand + cement and cover with wall seals provided.
Flue seals should be lubricated with a silicone type grease to prevent damage (grease not sup-
plied)
18
Standard concentric flue installation
Rear Outlet
Side view
P = S + 155 mm
Cod. 3540M164 - 02/2009 (Rev. 00)
OPTIMAX HE PLUS 18 OV
Side Outlet
Front view
View from above
fig. 17b
L = S + D + 130 mm