Alcatel-Lucent OmniSwitch 6250-24M User Manual page 116

Hide thumbs Also See for OmniSwitch 6250-24M:
Table of Contents

Advertisement

Roles Within the Stack
Primary
Secondary
!
Offline
Secondary
Offline
Primary
Secondary
Primary
page 6-6
Redundant Management Module Failover (Two Switches)
Managing OmniSwitch 6250 Stacks
1
A stack of two OmniSwitch 6250 switches is operating
normally. The stack consists of a primary module and a
secondary module. (The software on both elements in
the stack is synchronized.)
2
The primary management module fails or is taken
offline (e.g., powered off or rebooted by the user).
The switch operating as the secondary management module
3
immediately takes over the primary role. It is at this point
essentially operating as a stand-alone switch.
4
If the switch that previously failed or was taken offline
comes back online, it will assume the secondary role in the
stack.
OmniSwitch 6250 Hardware Users Guide
June 2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents