® POWER SYSTEMS, INC. Owner’s Manual 100 and 200 Amp “V” Type and “Y” Type Transfer Switch Models: 09227-0, 09228-0, 09229-0, and 09230-0 This manual should remain with the unit.
Also read the instructions and information on tags, decals, and labels that may be affixed to the transfer switch. Replace any decal or label that is no longer legible. DANGER! Connection of a generator to an electrical system normally supplied by an electric utility...
• Never work on this equipment while physically or mentally fatigued. • Keep the transfer switch enclosure door closed and bolted at all times. Only qualified personnel should be permitted access to the switch interior.
Generac Power Systems, Inc. TRANSFER SWITCH DATA PLATE Affixed permanently to the transfer switch door is a DATA PLATE. Use the transfer switch only within the specific limits shown on the DATA PLATE and on other decals and labels that may be affixed to the switch.
MOUNTING DIMENSIONS - 100 AMP,2-POLE UNIT Generac “V” Type and “Y” Type Transfer Switch Install the transfer switch as close as possible to the electrical loads that are to be connected to it. To pre- vent switch distortion, level all mounting points. If necessary, use washers behind mounting holes to level the unit.
Figure 2.3 — 200 Amp 2-pole Transfer Mechanism 2.4.2 3-POLE MECHANISMS This switch (Figure 2.4) is also used with a single phase system, when the single phase NEUTRAL line is to be connected to a Neutral Lug and is not to be switched.
Common (4) to Normally Closed (6) Common (4) to Normally Closed (5) Note any optional accessories that may be installed on the transfer switch or are to be installed in the standby electric system in conjunction with the switch. Complete the necessary connections for these accessories.
Also, read the instructions and information on tags and decals affixed to the transfer switch. Note any options and accessories that might be installed or provided with the switch and review their operation.
SHOCK. 7. With an accurate AC voltmeter and frequency meter, check the no-load, voltage and frequency meter at transfer switch terminal lugs E1, E2 and NEUTRAL. Readings should be as follows: a. Frequency ...61-63 Hz b. Terminals E1 and E2 ...242-253 volts c.
2. Manually actuate the transfer switch main con- tacts to their STANDBY position. 3. To start the generator, set the Auto/Off/Manual switch to MANUAL. When engine starts, let it sta- bilize for a few minutes. 4. Turn the generator's main circuit breaker to its ON or CLOSED position.
NOTE: ALL UNITS MUST HAVE A START-UP INSPECTION PERFORMED BY AN AUTHORIZED GENERAC DEALER. For a period of 2 (two) years from the date of sale/start date, Generac Power Systems, Inc. will, at its option, repair or replace any part(s) which, upon examination, inspection, and testing by Generac Power Systems or a Generac Power Systems Authorized Warranty Service Facility, is found to be defective under normal use and service, in accordance with the warranty schedule set forth below.