Routine Check After Installation - GE GAIRZ09IG Series Owner's Manual And Installation Instructions

Wall mounted split air-conditioner
Table of Contents

Advertisement

Available languages

Available languages

GE_SAC_ENGL
01-02-2011

Routine check after installation

What to check
For models with an indoor 4 positions switch – is the
switch set on RUN?
For models with heating capacity – can the
wastewater be drained from the base plate of the
outdoor unit?
Has the unit been fixed firmly in place?
Has the refrigerant leakage test been done?
Is heat insulation sufficient?
Does the unit drain well?
Is the voltage in accordance with the rated voltage
marked on the nameplate?
Is the electrical wiring and piping connection installed
correctly and securely?
Has the ground connection been made securely to
recommended earth ground points?
Is the power cord as specified?
Are the air inlet and outlet blocked?
Has the length of the connection pipe and the thermal
capacity been verified?
28
Page 28
Possible consequence
Unit will automatically start after a power
cut
Limited defrosting on the outdoor unit and
reduced heating capacity
The unit may drop, shake or emit noise
Reduced capacity
Condensation and dripping
Condensation and dripping
Electrical malfunction or damaged
components
Electrical malfunction or damaged
components
Electrical leakage, shock
Electrical malfunction or damaged
components
Reduced capacity
Reduced capacity
Notes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents