Omron EasySpeed 3G3JE User Manual page 64

Compact simplified inverters
Table of Contents

Advertisement

Chapter 3
Operation
3-2
Procedure for Test Run
1. Installation and Mounting
Install the Inverter according to the installation conditions. Refer to page 2-4.
• Make sure that the installation conditions are met.
2. Wiring and Connection
Connect to the power supply and peripheral devices. Refer to page 2-6.
• Select peripheral devices that meet the specifications and wire correctly.
3. Power ON
Carry out the following pre-connection checks before turning ON the power supply.
Refer to page 3-5.
4. Checking the Display Status
Check to be sure that there are no faults in the Inverter. Refer to page 3-5.
5. Initializing Parameters
Initialize the parameters. Refer to page 3-5.
6. Setting Parameters
Set the parameters required for a test run. Refer to page 3-6.
7. No-load Operation
Start the motor without a load using the RUN Key. Refer to page 3-7.
8. Actual Load Operation
Connect the mechanical system and use the Digital Operator for operation. Refer to page 3-8.
9. Operation
3-4