Siemens SIMATIC TI500 User Manual page 32

Tiway 1
Hide thumbs Also See for SIMATIC TI500:
Table of Contents

Advertisement

Installing the TIWAY I Gateway (continued)
3-4
Gateway Installation and Configuration
6.
Run the user-initiated test. (Refer to the Diagnostics Tests section.)
7.
Remove loopback connector.
8.
Set the Online/Offline switch on the Gateway to the ONLINE position.
9.
Connect the Local Line or RS-232 interface cable to the TIWAY I port.
10. Connect the host system interface cable to to the host port.
11. Configure the communications parameters on the host system. Make
sure that the host system baud rate matches the rate you plan to set on
the Gateway.
12. Set the dipswitches on the Gateway. Be sure to set the parity, duplex,
and synchronous/asynchronous selections to match the corresponding
settings on the host system. (See Figure 3-3 and Section 3.2.)
13. Check to see that the GATEWAY GOOD, TRANSMIT, and RECEIVE
indicators on the Gateway are on, and that TEST is flashing.
14. Configure the data and status registers in the variable memory of the
PLCs on the TIWAY I network. (Refer to the appropriate PLC manuals
for more information if necessary.)
15. Press the RESET button on the Gateway.
16. Begin program execution.
TIWAY I Gateway User Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents