GE 225 Installation Manual page 13

Digital energy 225 and 300 kva / series 0 uninterruptible power supply
Table of Contents

Advertisement

g
Openings for input and output cable connections
Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables
Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables
Fixing of the UPS cabinet on the floor
The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor.
See Fig. 3.4.1-4.
1.378"
35mm
Ø 0.47305"
Ø 12mm
SGS_225-300_UPS view bottom_02US
OPM_SGS_ISG_M22_M30_0US_V011.doc
Battery
Utility input
Output Load
62.205"
1580mm
Front side
Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor
13/38
Utility input
Output Load
SG Series openings are
provided on the top and
the bottom of the UPS
for the connection of
input and output cables.
Pay
attention
position
openings,
choosing the placement
of the UPS.
These
covered
protective plate.
Installation Guide SG Series 225 & 300 kVA
GE
to
the
of
these
when
openings
are
with
a
1.378"
35mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

300Sg series

Table of Contents