Unpacking - GE 225 Installation Manual

Digital energy 225 and 300 kva / series 0 uninterruptible power supply
Table of Contents

Advertisement

g
3.6

UNPACKING

The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden
crates (if requested).
Move the cabinets as close as possible to the final location before removing from the pallet.
If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the
heavy weight of the equipment.
Take care not to damage the UPS when moving by forklift.
For parallel systems, the delivery also includes the bus control
cables for inter-connecting the UPS modules.
Packing material recycling
GE Industrial Systems, in compliance with environment protection, uses
only environmentally friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.
OPM_SGS_ISG_M22_M30_0US_V011.doc
Installation Guide SG Series 225 & 300 kVA
16/38
GE

Advertisement

Table of Contents
loading

This manual is also suitable for:

300Sg series

Table of Contents