Chapter 5 Advanced Serverboard Setup; Handling The Serverboard; Precautions; Unpacking - Supero 1022GG-TF User Manual

A+ server
Hide thumbs Also See for 1022GG-TF:
Table of Contents

Advertisement

This chapter covers the steps required to install the H8DGG-QF serverboard into
the SC818G-1400BP chassis, connect the data and power cables and install add-on
cards. All serverboard jumpers and connections are also described. A layout and
quick reference chart are included in this chapter for your reference. Remember to
completely close the chassis when you have finished working with the serverboard
to better cool and protect the system.
5-1

Handling the Serverboard

Electrostatic Discharge (ESD) can damage electronic com ponents. To prevent
damage to any printed circuit boards (PCBs), it is important to handle them very
carefully (see previous chapter). To prevent the H8DGG-QF serverboard from bend-
ing, keep one hand under the center of the board to support it when handling. The
following measures are generally sufficient to protect your equipment from electric
static discharge.

Precautions

Use a grounded wrist strap designed to prevent Electrostatic Discharge
(ESD).
Touch a grounded metal object before removing any board from its antistatic
bag.
Handle a board by its edges only; do not touch its components, peripheral
chips, memory modules or gold contacts.
When handling chips or modules, avoid touching their pins.
Put the serverboard, add-on cards and peripherals back into their antistatic
bags when not in use.
For grounding purposes, make sure your computer chassis provides excellent
conductivity between the power supply, the case, the mounting fasteners and
the serverboard.

Unpacking

The serverboard is shipped in antistatic packaging to avoid electrostatic discharge.
When unpacking the board, make sure the person handling it is static protected.
Chapter 5
Advanced Serverboard Setup
Chapter 5: Advanced Serverboard Setup
5-1

Advertisement

Table of Contents
loading

Table of Contents