Step 4: Connect Devices To The Sub-Network - GE P485 Instruction Manual

Modbus to profibus converter
Table of Contents

Advertisement

STEP 4: CONNECT
DEVICES TO THE SUB-
NETWORK
P485 MODBUS TO PROFIBUS CONVERTER – USER GUIDE
The fourth step in the configuration wizard is to connect the configured device types to the
sub-network. The PQMII and MM2 devices are connected in this step.
1.
Click Next to proceed to create nodes on Modbus network as shown below.
Figure 9-11: Connect devices to sub-network
2.
There are two nodes on the Modbus network: the PQMII meter and the MM2 relay. To
insert a node, click the Create Node button.
3.
Set the Node Name as "PQMII Meter", the Slave Address to "20", and the Device Type
to "PQMII".
4.
Similarly create another node for the MM2. Set the Node Name as "MMII Relay", the
Slave Address to "4", and the Device Type as "MM2-MM3".
5.
Click Next to proceed to step 5 of the configuration wizard.
Figure 9-12: Node for PQMII meter
Figure 9-13: Node for MM2 relay
APPLICATION EXAMPLE
9–9

Advertisement

Table of Contents
loading

Table of Contents